MONTANK - NEW OFFICES, MONTREAL
5978 est, Notre-Dame, Montréal (Québec)

Construction Progress Report

These pages are dedicated to presenting a photographic report of construction progress of the above-mentioned project.

Week 09, ending October 10th, 1998

Weekly progress summary:

  • Windows have been installed!
  • Drywall board joint taping is essentially completed.
  • Painting continues.
  • Exterior asphalt repairs are completed.

Sorry, there are no pictures of the office building this week.  (Digital camera was not available).

However, Peter Laekas and the undersigned had a look at the dock installations at Racine's to look at the possibility of installing a retaining curb around pumping facility.

Click on thumbnail image to see full-size version

dock.jpg
dock.jpg

16.72 Kb
pipesupp.jpg
pipesupp.jpg

20.23 Kb

Home | Previous Week (8) | Next Week (10)


Prepared by
Larry O'Shaughnessy, architect

Comments are welcome !
mail.gif (14893 bytes)
lgoshaug@total.net

© 2014, Larry O'Shaughnessy architecte.
Date de la dernière mise à jour de cette page: 2014-10-31